Facilities

Wipac’s Buckingham factory continues to evolve as part of our long-term investment plan in the specialist lighting business and currently includes the following facilities:

Injection moulding

  • press range from 100T to 500T
  • two colour moulding capability
  • clean air hoods

Finishing

  • manual and automated lines for silicone hard-coating of lenses
  • three manual paint spray booths
  • Balzer vacuum metalliser for aluminising of decorative bezels and optical reflectors

Assembly

  • purpose built clean rooms for product assembly
  • clean room 1, Class 10,000 / IP7, 190m2
  • clean room 2, Class 10,000 / IP7, 130m2

Bonding

  • six axis gluing robot using PUR adhesives
  • ultrasonic welding
  • hot plate welding
  • non-contact infra-red welding
  • vibration welding.
  • Specialist lighting low volume assembly in Wipac clean room 1

  • Six axis gluing robot for lens bonding, located in clean room 1

  • Vibration welding system for rear-lamp assemblies

  • Non-contact infra red welding system for rear-lamp assemblies

Top of page